Saturday, August 17, 2013

Away on Vacation

Kinda reminds me of posting an away message on aim back in the day.  Hubs and I return tomorrow after spending Wednesday through Sunday at the beach.

Tuesday, August 13, 2013

Basement Inspiration : Laundry Room

Since we have dove into the deep end and gone full speed ahead with the basement renovation, its about time I share (or come up with!) some decor inspiration.  Today, it is all about the Laundry Room.  Honestly, it is one chore I absolutely despise doing in all shapes and forms.  Blah.  So, lets just say this itty bitty room better kick a$$ and be the most welcoming room e-v-e-r.

Here are some great looks that I found on Pinterest and have seen on the interwebs which will work great for our space.  Check out my Pinterest for sources.





I think this one is my fave though!  Maybe it is all the decorations that will likely never make it on my shelves (a girl can dream though!)
{via}
You get the gist though
1) Definitely front load washer-dryer so that a countertop can be installed.  Need plenty of workspace.
2) Some type of backsplash or fun wallpaper/paint.
3) Shelves, shelves, shelves.  I think I will forgo cabinets.  Shelves will keep the room looking airy and open.
4) Light colors, to keep with the 'airy' theme
5) A built in drying rack / clothes hanging space is a must.

I may be convinced that doing laundry is actually 'fun' if I have a space like one of those above!

Monday, August 12, 2013

Let There Be Light

We worked on the basement this weekend ... its our 'thing' these days.  I had to work Saturday and came home to a handy Hubs chugging along on installing recessed lighting and wirin' em' up!  Of course I jumped in on the action.  We got pretty far I would say.

Here's a recap:
1) 95% done with installing all the electrical boxes
2) 90% done with installing and wiring the recessed lighting
3) 80% done with installing the back boxes and wiring for the wall sconces
4) 40% done with wiring for switches
5) 10% done with demoing all the old wire

What's left:
1) Install a couple more electrical boxes
2) Finish installing (3 more) and wiring all the recessed lights
3) Install the last wall sconce (it needs to be centered between the bathroom and laundry room - we don't have the wall up for the laundry room yet)
4) Pull wire for remaining switches and wire all outlets
5) Connect all switches and outlets
6) Demo all old wire - this is going to be a doozy!  We have old rag-wire for the upstairs (original to the house from 1951).  It definitely needs to go (possible fire hazard) and while the ceiling is open and available we are going to get er' done.

Whew, still lots to do.  In the meantime I will relish in what we accomplished so far.

First up, what our lighting plan looks like from our model ...
Recessed Lighting Plan
And, a glimpse inside the model.  The eye height is set to about 5'0" and you are standing behind the couch looking at a projector screen ...

And, now for the 'real' work.
Action Shot! Stripping the wires for connection to the recessed lighting.  I am standing in about the same location as the pic above (behind the couch)
Wha-La!  First Light On!  Oooo-Ahhhh

First Row of Lights Done. Oh hey there Mr. Grouper! Grouper is right in front of the couch in the model. 

Working on the Straps for the Wall Sconce Boxes

Wall Sconce Boxes installed and wired (The white fixture is just temporary for additional lighting)
Recessed Lighting and Wall Sconce Lighting Turned On

Another Shot. From where the projector screen is in the model

Wiring Switches

Oh Hey Grouper :)
 And, as you should always do, celebrate and eat beer can chicken dinner!

Thursday, August 8, 2013

So Studly

We have studs my friends!  Stud framing is about 95% complete in the basement.  It really didn't take too long.  Only about a day.  I was mainly responsible for taking measurements and sliding the studs into place.  Hubs made all the cuts and screwed them in place.

The next two pictures are of the interior walls which are 3 5/8"; mind you that the entire exterior wall at the insulation has 2 1/2" studs.

Looking at the Storage and Bathroom

Looking at the 'Nook' and Bedroom

Tuesday, August 6, 2013

Basement Design Reveal

What we have been working long and hard on ... finally revealed!  Our basement design, which has been in the works since the day we bought it.  Oh believe me, I was already dreaming up ideas and designs in my head before we even signed the papers on the house!  Once the deal was signed, sealed, and delivered, Hubs and I talked through the design concept, took plenty of measurements, drew up schematics, and then finally took time to put pen on paper, or in this case, clicking away in Google SketchUp.

(Click on each picture to see in larger size)









Friday, August 2, 2013

Oh Yes We Did ... Basement Fun

Why wait till winter to start another big project when you can start now!  That's right, Grande Project #2 has started.  Basement Renovation here we come.  I will have to say that the most humid and hot weather of early July definitely helped us snap to it.  Who wants to sweat just sitting outside when you can grab a light jacket for basement fun!

I'll catch you up:
1)  We did some light demo.  Mainly taking down the wall paneling in the future bedroom, the walls around the furnace and hot water heater, and the wall between the 1/2 bath and laundry room.

Working on Demo
Wall Demo between 1/2 Bath and Laundry
2)  Hubs added some fire safing between the floor joists and exterior wall.  Mainly to help insulate along the exterior wall.  Doesn't hurt to have added fire protection too!

3)  Hubs did some dumpster diving and grabbed some rigid insulation out of the construction dumpster.  They were throwing this stuff away!  A little dirt never hurt anyone.  The blue board in the pics below is what was grabbed.  It is 3" R-15 rigid board.

Blue Board Up On the Walls
4)  Unfortunately there wasn't enough blue board to laminate all the walls.  So, we headed to his fave store Home Depot and got some more rigid insulation.  It is slightly different.  2" R-13 rigid board.  Hubs used Liquid Nail to glue these babies on the wall.  We also used Tyvek Tape to tape e-very single seam (that was my job).

R-Max Up On the Walls
5)  Then we started on layout and installing the top and bottom tracks for wall construction.  A laser is definitely key to accuracy and ease of installation!  Hubs used a powder actuated hammer to secure the bottom track to the concrete floor; screws for the top track to the floor joists.

Working on the Wall at the Future Laundry/Bath/Storage Room


 That pretty much sums up our current status in the basement.  Looks pretty cool huh ...



More to come - our basement floor plans and 3-D model, design ideas and process, budget, schedule ... and more!

K, I am out ... Hubs is messing with the wiring and electrical panel downstairs.  I feel like I need to be supervising haha :)

Thursday, August 1, 2013

Mirror Magic

Yes, I call it magic that I actually completed the mirror in a timely fashion and ended up blogging about it.  Ha.  A DIY Success!