Thursday, August 8, 2013

So Studly

We have studs my friends!  Stud framing is about 95% complete in the basement.  It really didn't take too long.  Only about a day.  I was mainly responsible for taking measurements and sliding the studs into place.  Hubs made all the cuts and screwed them in place.

The next two pictures are of the interior walls which are 3 5/8"; mind you that the entire exterior wall at the insulation has 2 1/2" studs.

Looking at the Storage and Bathroom

Looking at the 'Nook' and Bedroom

No comments:

Post a Comment