Unfortunately, that doesn't mean that the basement is complete. It does, however, mean that the finishers came this past weekend to tape, block, and skim the drywall! Say what? You hired someone else to do a little basement work? Yes, we did. Drywall finishing is quite an art. Those that know how to do it can work some miracles!
So, Hubs lined up some great 'artists' (I believe they earn that distinction) ... and wa la. Where did the miracle happen - well, they were able to completely hide to exposed copper lines, one in the bathroom and the other in the laundry room.
Since then, we have been busy every-single-night after work hanging doors (more to come). We cut it short tonight so I could finally post an update here. The guys are back on Saturday to sand the walls, and then we may just be ready for PAINT! So much easier than hauling and holding 4x8 sheets of drywall over your head.
Stay posted for more ... hopefully in a couple of days, not a couple of weeks.
Thursday, January 16, 2014
Monday, January 6, 2014
A Drywall Frenzy
Last time I left off we had made such great progress and were ready for drywall. Well, we kicked it into high gear and totally knocked out more drywall than I ever hope to see in the future. It was something we thought about getting someone else to do, but in typical fashion, we knew we would save a boat load of money hanging the drywall ourselves ... so decided logic outweighed the crazy, or maybe that is the other way around.
In reality, we insulated and hung drywall in tandem - with me leading the insulation front and Hubs trailing slightly behind hanging drywall with my help as needed. That is until we got to the ceiling part. That my friends, was probably certifiable crazy - the two of us, with me on a ladder trying to hold up most of the drywall weight with Hubs on the other end using one hand to hold the drywall and the other to screw in the drywall. Just imagine some bickering back and forth WHILE holding up drywall and then random uncontrollable laughter because we just realized, in fact, that we are crazy.
Anyway, let me break this down in photos for you, with progress by room:


In reality, we insulated and hung drywall in tandem - with me leading the insulation front and Hubs trailing slightly behind hanging drywall with my help as needed. That is until we got to the ceiling part. That my friends, was probably certifiable crazy - the two of us, with me on a ladder trying to hold up most of the drywall weight with Hubs on the other end using one hand to hold the drywall and the other to screw in the drywall. Just imagine some bickering back and forth WHILE holding up drywall and then random uncontrollable laughter because we just realized, in fact, that we are crazy.
Anyway, let me break this down in photos for you, with progress by room:
Family Room
Laundry Room
Bathroom
Storage/Hubs' Room
Spare Room
Ring in the New Year
This seems like a good day to start a new year, a Monday, it only seems fitting. I will say, the holiday season this year has been quite a whirlwind since both Christmas and New Year fell on a Wednesday. Working all other days of the work week, it has put a twist on our normal celebrations. Our 'holiday celebrations' didn't officially end till this past weekend when we got a chance to celebrate with Hubs parents. So the Christmas tree is still up and good as ever. I am thinking of keeping it that way for a couple more weeks ... shhh. I love the holiday season, and apparently so does Grouper.
But, now that is is January 6th, I am pretty sure it is time to make some new resolutions for the year! Looking back at 2013s (which I supposedly didn't post), I am pretty impressed with myself. Lots of fantastic changes and accomplishments happened in 2013. Now, drum-a-roll, 2014s:
But, now that is is January 6th, I am pretty sure it is time to make some new resolutions for the year! Looking back at 2013s (which I supposedly didn't post), I am pretty impressed with myself. Lots of fantastic changes and accomplishments happened in 2013. Now, drum-a-roll, 2014s:
- House - Finish the Basement. This goes without saying since this project has consumed us for about 6 months. However we typically always have odds and ends left with most of our projects. I am not saying it is going to be perfectly designed with nice accents and decor all decided, but the construction and heavy lifting part should totally be done done done.
- Then Save Money - I feel that my paycheck goes to Home Depot right now. So that is something we reallllly are going to make a priority this winter/spring.
- Travel - Hoping to squeeze in a couple trips that require a plane to get there.
- Keep in touch with friends - It seems that time keeps speeding up. Catch up with friends at least once a month.
- Grow and develop my career - I have a fantastic new job so I want to keep learning and growing
- Keep this blog up - I have been a major slacker on the blog, but love it. I am pretty sure 2014 has lots of fun things in store for us and lots of house projects. I really want to be proactive with writing posts and sharing insights and tips in lieu of my recent retroactive 'oh hey, look at alll this work we did'.
Monday, December 16, 2013
Basement Close-In
We are reaching that point ... close-in inspection is scheduled for Friday so, really, we are there! Let me catch you up on progress in the basement.
1. Plumbing - We shifted the waste pipes for the shower and toilet.
That required chipping concrete, digging around the waste pipes, and adding/shifting the pipes.
Adding gravel back and pouring concrete.
Then pouring some leveling compound in the shower area to level our wonky concrete. This will ensure our shower drains correctly.


And then ...
4. Drywall - we started one-siding interior walls. The inspector needs to see all the rough-in, but he can still see all that jazz with one layer of drywall installed. We got a little antsy for the next step, and also wanted to see if we had it in ourselves to install all that drywall. Conclusion - Yes!
1. Plumbing - We shifted the waste pipes for the shower and toilet.
That required chipping concrete, digging around the waste pipes, and adding/shifting the pipes.
Adding gravel back and pouring concrete.
Then pouring some leveling compound in the shower area to level our wonky concrete. This will ensure our shower drains correctly.
Lets not stop there ... we had to modify the vanity waste pipes and hot and cold water supply. We also added lines for a laundry sink (opposite the bathroom vanity)!
We bought our shower diverter and added hot and cold water supply off the lines to the washer machine. I also was able to add a nice Grouper bath-time feature. Basically an outdoor spigot that you can connect a hose too!

2. HVAC -
We finished insulating all the supply ductwork.
Cutting in two registers for the family room.
And running ductwork for the bathroom (no picture ... oops).
3. Carpentry - we added blocking in the laundry room and storage room.
And then ...
4. Drywall - we started one-siding interior walls. The inspector needs to see all the rough-in, but he can still see all that jazz with one layer of drywall installed. We got a little antsy for the next step, and also wanted to see if we had it in ourselves to install all that drywall. Conclusion - Yes!
| Family Room |
| Storage Room |
| Spare Room |
Monday, November 25, 2013
Earth Shattering ... Or Not
Hubs worked on Saturday, which meant I had time to tinker and get little odds and ends done at the house. One being this oh so difficult and time consuming project ... or not. It was one so simple but always pushed to the back burner until I decided enough was enough.
Ladies and gents, behold some clean and paint free door glass (both horrible and quick iPhoto pics) ...
Ladies and gents, behold some clean and paint free door glass (both horrible and quick iPhoto pics) ...
Before
After
Friday, November 22, 2013
Total Paint Re-do
I have mentioned it before, but I really want to re-paint the entire upstairs. Not to mention that I will soon have to pick out a paint color for the basement.
Afterseveral too many hours spent googling the best greige-y colors out there and painting some samples on our dining room and bedroom walls here is what I have almost picked out.
After
- Revere Pewter for the upstairs
- Edgecomb Gray (a lighter version of Revere Pewter) for the basement
Revere Pewter
![]() |
| {via} |
Edgecomb Gray
![]() |
| {via} |
Tuesday, November 12, 2013
Basement Bathroom Inspiration
It is time to start nailing down finishes (I wish literally, but until then I gather inspiration). I am going for what I like to call a 'modern rustic' theme for the basement.
Googling that theme surprisingly brought up a plethora of photos I like! If you want to get an idea of where my head is at, I rated the inspiration photos below by making them different sizes:
Large=Super Like
Medium=Like
Small=That's an idea
Subscribe to:
Posts (Atom)






















